← Drill Programs

Gold

Duquesne West Gold Project

Emperor Metals Inc. CSE: AUOZ

Results Pending Quebec, Canada
Best intercept
21.3 m @ 3.0 g/t Au ↗ Released Jul 29, 2026
Metres drilled
20,479 m new drilling completed; approximately 7,884 m of historical core resampling is separate. Additional 3,000-5,000 m planned
Last update

Metres drilled to date

2 disclosures
Metres drilled to date by release
Release dateMetres to date
Sep 9, 202620,479 m
Oct 13, 202620,479 m
Cumulative metres as stated in each release. Points link to the source event below. Report a correction

Program timeline

  1. 05
    Assay results

    Final assays for seven more holes. DQ26-51 returned 26.3 m grading 1.0 g/t Au from 42.5 m, including 2.0 m at 4.3 g/t Au and 6.1 m at 2.0 g/t Au. DQ26-22 returned 19.2 m grading 1.2 g/t Au from 111.1 m, including 6.3 m at 2.8 g/t Au. The company estimates true thickness for these highlights at 70% to 90%. Results had been reported for 51 of 66 holes. An additional 3,000 to 5,000 m is planned after a brief pause to interpret results.

    Source: Company IR ↗
  2. 04
    Update

    Visible gold was reported in DQ26-55 at 398 m downhole in a 20 m pyrite zone. The hole was drilled at an azimuth of 006 degrees and a dip of -64 degrees to 525 m. Assays were pending. The company restated 20,479 m of new drilling and approximately 7,884 m of historical unsampled core.

    Source: Company IR ↗
  3. 03
    Assay results

    Hole DQ26-52 returned 24.1 m grading 2.6 g/t Au from 45.2 m, including 7.1 m grading 7.5 g/t Au. The company said the program comprised 20,479 m of new drilling and approximately 7,884 m of historical core resampling, with assays reported for 42 of 66 holes.

    Source: Company IR ↗
  4. 02
    Assay results

    Hole DQ26-43 returned 21.3 m grading 3.0 g/t Au from 64.9 m to 86.7 m. The company estimated true thickness at 70% to 90%. Results had been reported for 31 of 66 holes, and Emperor said the 2025-2026 drilling was complete at about 20,479 m in 66 holes.

    Source: Company IR ↗
  5. 01
    Program start

    Emperor announced the start of a 10,000 to 15,000 m diamond drill program at Duquesne West for the 2025-2026 winter season. No metres completed were stated.

    Source: Company IR ↗

About the project

Duquesne West is Emperor Metals’ gold project in the Abitibi, 32 km northwest of Rouyn-Noranda and 10 km east of Duparquet, Quebec. Emperor holds an option to acquire a 100% interest. The 2025-2026 diamond program is reported as 20,479 m of new drilling, plus approximately 7,884 m of historical core resampling, which is not included in the metres figure.

The July 29 and October 20 releases estimate true thickness for the highlighted intervals at 70% to 90% of the reported length. No release reviewed for this profile states collar coordinates with a datum or zone, and the project page does not give a project-centre coordinate, so the profile is not plotted.

Running your own program?

Log the next program in one database.

Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.

  • 01 One live database, no version conflicts
  • 02 Per-project pricing, not per-seat
Get Early Access

Free during beta · No credit card

Related programs

Summaries of public disclosures by Emperor Metals Inc. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.

Report a correction →