- Best intercept
- 12.70 m @ 7.88 g/t Au (incl. 1.90 m @ 46.05 g/t Au) ↗ Released Sep 23, 2026
- Metres drilled
- 34,000 m cumulative metres drilled since 2023 as disclosed July 29, 2026
- Last update
Program timeline
- 04 Assay results
The release reports core-length assays, with true width unknown: an Elora hanging-wall interval of 12.62 g/t Au over 1.85 m, including 54.40 g/t Au over 0.40 m, at about 160 m true depth; DGR-078 at 8.57 g/t Au over 1.10 m on a new structure less than 20 m from known mineralization; and DGR-087, a step-out of over 400 m on strike, at 3.23 g/t Au over 1.60 m. The technical table linked from the release labels the hanging-wall hole DGR-26-082 and reports DGR-26-090 at 2.07 g/t Au over 9.50 m from 179.50 m to 189.00 m, including 6.70 g/t Au over 0.85 m and 5.24 g/t Au over 0.50 m.
Source: Company IR ↗ - 03 Assay results
DGR-058, between Jubilee and Pearl at about 65 m true depth, returned 7.88 g/t Au over 12.70 m, including 46.05 g/t Au over 1.90 m. The company reported continuity of high-grade gold over 350 m of strike on the Elora structure. Result intervals are drilled core lengths; true width is unknown.
Source: Company IR ↗ - 02 Assay results
Four holes tested down-plunge extensions at Spyglass and Buccaneer. DGR-073 returned 9.40 g/t Au over 4.60 m, including 78.40 g/t Au over 0.38 m; Spyglass was extended from about 190 m to 330 m vertical depth and Buccaneer from about 185 m to 370 m. Reported intervals are drilled core lengths and true width is unknown, and the fully funded 45,000 m program was reported as continuing.
Source: Company IR ↗ - 01 Assay results
Assays confirmed two new gold-bearing structures at Gold Rock. DGR-060C intersected 3.38 g/t Au over 4.30 m including 19.90 g/t Au over 0.50 m at Elora 2; DGR-065 returned 2.12 g/t Au over 1.02 m about 500 m along strike. Paymaster hole DGR-064 intersected 0.36 g/t Au over 7.00 m. A second rig was deployed to test down-plunge extensions at Jubilee, Spyglass and Buccaneer.
Source: Newsfile ↗
About the project
Gold Rock is Dryden Gold’s flagship project in the Dryden District of northwestern Ontario along the Manitou-Dinorwic deformation zone. The September 23, 2026 release reported that 2025-2026 drilling had grown the project from three mineralized structures to 15, with 10 high-grade zones. The October 22, 2026 release reports further core-length assays from the ongoing program. True width is unknown.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by Dryden Gold Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →