Gold
Scottie Gold Mine
Scottie Resources Corp. TSXV: SCOT
- Best intercept
- 4.15 m @ 27.9 g/t Au (incl. 1.65 m @ 65.0 g/t Au) ↗ Released Oct 14, 2026
- Last update
Program timeline
- 04 Assay results
Further Blueberry Contact Zone assays. SR26-509 returned 27.9 g/t Au over 4.15 m from 144.50 m to 148.65 m, including 65.0 g/t Au over 1.65 m, at the Lemoffe 1 vein. SR26-504 returned 51.6 g/t Au over 2.25 m from 210.6 m to 212.85 m, including 84.1 g/t Au over 1.25 m, at Fifi. SR26-545 returned 21.9 g/t Au over 4.26 m, and SR26-494 returned 5.2 g/t Au over 6.00 m. Intervals are core lengths; true widths had not been established. More than 55,000 m in 200 holes had been completed, with a further 3,000 to 5,000 m forecast. Five diamond drills were turning.
Source: Company IR ↗ - 03 Assay results
First 2026 assays from the Blueberry Contact Zone. SR26-492 returned 9.7 g/t Au over 18.00 m from 186.50 m to 204.50 m, including 40.4 g/t Au over 2.0 m, and 15.9 g/t Au over 2.00 m. SR26-489 returned 26.2 g/t Au over 2.45 m, and SR26-490 returned 14.6 g/t Au over 2.45 m. Intervals are core lengths; true widths had not been established. More than 40,000 m had been completed in 160 holes, with a further 12,000 to 16,000 m forecast. Eight drills were turning.
Source: Company IR ↗ - 02 Metre update
More than 25,000 m had been drilled in over 100 holes, about half of the planned 50,000 m. Eight diamond drills were turning, seven on the Scottie Gold Mine Project and one on Cambria. About 2,000 m had been drilled at the Domino target. The release does not give an exact metre total.
Source: Company IR ↗ - 01 Program start
Scottie commenced a fully funded 2026 program highlighted by a planned 50,000 m diamond drill campaign at the Scottie Gold Mine Project, aimed at the Blueberry Contact Zone and the Scottie Gold Mine, plus district targets including the Bend Vein, the C and D zones, the Serac Vein, the Lakebed area and Domino. About 2,000 m was also planned at Cambria, the first drilling on that property. No 2026 metres completed were stated.
Source: Company IR ↗
About the project
The Scottie Gold Mine Project, 35 km north of Stewart, British Columbia, includes the historic Scottie Gold Mine and the adjacent Blueberry Contact Zone. The 2026 diamond program is drilling the Fifi, Lemoffe and Blueberry vein zones, both inside the existing resource and along extensions of known veins.
Intervals reported on September 9 and October 14 are core lengths. True widths had not been established. As of October 14, more than 55,000 m in 200 holes had been completed, with a further 3,000 to 5,000 m forecast and five diamond drills still turning. The releases state those metre figures as “more than” a round number, so no exact total is entered.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by Scottie Resources Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →