- Best intercept
- 14.75 m @ 1.56% CuEq (0.76% Cu, 0.792 g/t Au and 2.855 g/t Ag) ↗ Released Oct 15, 2026
- Metres drilled
- 607 m five holes completed, as stated on July 13; the October 13 and October 15 releases describe Phase 1 as five holes and 600 m
- Last update
Program timeline
- 03 Assay results
Cascade reported the remaining logged holes from the five-hole, 600 m Phase 1 program. CF-26-04 returned 1.56% CuEq over 14.75 m from 29.00 m to 43.75 m (0.76% Cu, 0.792 g/t Au and 2.855 g/t Ag), within 0.42% CuEq from 6.60 m to 129.0 m (122.40 m), and including 1.11% CuEq over 29.6 m from 14.15 m to 43.75 m. CF-26-01, on a separate banded-iron-formation target, returned 0.31 g/t Au over 15.50 m from 44.0 m (with 0.89 g/t Au and 0.10% Cu over 1.75 m), 1.02 g/t Au over 2.75 m from 56.75 m (including 1.55 g/t Au and 0.18% Cu over 1.0 m), and 0.10 g/t Au over 11.70 m from 139.65 m to 151.35 m. Sampling of CF-26-02, a shallower cut of the same target, was delayed pending CF-26-01 and is to be processed. A Phase 2 program is planned. Lengths are down-hole.
Source: Company IR ↗ - 02 Assay results
Final results from two holes of the five-hole Phase 1 program. CF-26-05 returned 1.27% CuEq over 10.5 m from 12.0 m (0.86% Cu, 0.38 g/t Au and 3.36 g/t Ag, 12.0 m to 22.5 m), within 0.84% CuEq over 27.1 m from 9.0 m. CF-26-03 returned 1.18% CuEq over 10.75 m from 21.75 m (0.75% Cu, 0.41 g/t Au and 2.75 g/t Ag, 21.75 m to 32.50 m), within 0.73% CuEq over 26.0 m from surface. Assays were still pending for CF-26-01 and CF-26-04, and a Phase 2 drill program was described as planned.
Source: Company IR ↗ - 01 Update
Cascade reported the maiden Centrefire drill program complete: five holes totalling 607 m. All five holes intersected sulphide mineralization, and logging and sampling were continuing. Initial assays were expected in six to eight weeks.
Source: Company IR ↗
About the project
Centrefire is Cascade Copper’s copper-gold-silver project in the Wabigoon greenstone belt, about 40 km northeast of Dryden, Ontario. Phase 1 was a five-hole maiden diamond program. Drilling finished in July 2026. The October 15 release reports CF-26-04 at the Main Gossan Zone and banded-iron-formation gold in CF-26-01. Sampling of the shallower CF-26-02 cut was delayed and is still to be processed. A Phase 2 program is planned. Highlight lengths are down-hole. The headline 0.42% CuEq over 122.40 m is the interval the figure caption places from 6.60 m to 129.0 m.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by Cascade Copper Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →