← Drill Programs

Gold · Silver · Copper · Zinc

Ishkōday

LAURION Mineral Exploration Inc. TSXV: LME

Actively Drilling Ontario, Canada
Metres drilled
4,915 m of ~5,605 m planned Phase 1 (22 holes); as of Sept 1, 2026
Last update

Program timeline

  1. 05
    Assay results

    Phase 1 assays from LBX26-111 and LBX26-112 at A-Zone and McLeod included 3.35 m grading 0.523 g/t Au in LBX26-111. LBX26-112 returned 1.20 m grading 6.580 g/t Au, and 6.00 m grading 0.206 g/t Au, 19.80 g/t Ag, 0.28% Cu and 0.83% Zn, including 0.50 m grading 1.795 g/t Au, 223.00 g/t Ag, 3.31% Cu and 8.47% Zn. Core lengths are drilled thicknesses; true widths were not determined.

    Source: Company IR ↗
  2. 04
    Assay results

    Holes LBX26-109 and LBX26-110 returned further gold and polymetallic intercepts, including 9.90 m grading 0.563 g/t Au (incl. 2.30 m at 1.693 g/t Au) and 4.55 m grading 0.76% Cu and 12.29 g/t Ag (incl. 1.70 m at 1.56% Cu and 24.45 g/t Ag) in LBX26-110.

    Source: TheNewswire ↗
  3. 03
    Assay results

    Assays from LBX26-106 and LBX26-107 included 3.75 m grading 0.568 g/t Au, 12.40 g/t Ag, 0.46% Cu and 1.75% Zn, and 2.90 m grading 0.608 g/t Au, 11.93 g/t Ag, 0.34% Cu and 0.93% Zn. Phase 1 remained ongoing.

    Source: TheNewswire ↗
  4. 02
    Metre update

    Phase 1 was expanded to approximately 5,605 m across 22 holes. As of the release, 18 holes totalling about 4,915 m were complete, with drilling continuing on LBX26-116 through LBX26-124 and assays pending.

    Source: Company IR ↗
  5. 01
    Program start

    LAURION announced commencement of Phase 1 diamond drilling at Ishkōday, initially planning about 10 holes and 3,175 m of A-Zone infill and new northeastern corridor targets.

    Source: TheNewswire ↗

About the project

Ishkōday is LAURION’s 100%-owned gold and polymetallic project about 220 km northeast of Thunder Bay and 28 km northeast of Beardmore, Ontario, within the Beardmore-Geraldton greenstone belt. The A-Zone sits inside a broader mineralized corridor several kilometres long.

The 2026 Phase 1 program is testing A-Zone and McLeod continuity with infill and step-out holes aimed at supporting a potential maiden mineral resource estimate. Drilling was expanded mid-program and remained active through September assay releases.

Running your own program?

Log the next program in one database.

Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.

  • 01 One live database, no version conflicts
  • 02 Per-project pricing, not per-seat
Get Early Access

Free during beta · No credit card

Related programs

Summaries of public disclosures by LAURION Mineral Exploration Inc. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.

Report a correction →