← Drill Programs

Gold

Wawa Gold Project

RPX Gold Inc. TSXV: RPX

Actively Drilling Ontario, Canada
Last update

Program timeline

  1. 02
    Assay results

    Assays from 12 holes totalling 2,051 m included SD-26-701 at 25.50 g/t Au over 4.26 m core length, including 135.00 g/t Au over 0.71 m, in the South Pit. Intervals use a 0.40 g/t Au cut-off and up to 6.0 m of internal dilution, with no capping, and are core lengths; true width in the Jubilee Shear is estimated at 50 to 95% of core length. The 20,000 m program was still underway and expected to finish by the end of October, with about two-thirds of the PFS-related meterage complete. No cumulative program metres were stated.

    Source: Company IR ↗
  2. 01
    Metre update

    RPX reported a second diamond drill mobilized on the ongoing 20,000 m program, which had started in April. As of July 12, approximately 5,000 m had been completed.

    Source: Company IR ↗

About the project

The Wawa Gold Project is in the Michipicoten greenstone belt of northwestern Ontario. The 2026 program is a planned 20,000 m of drilling to support a prefeasibility study, with completion expected by the end of October. Intervals in the October 7 release are core lengths. Collar coordinates in that release are UTM easting and northing without a stated zone or datum, so this profile is not plotted.

Running your own program?

Log the next program in one database.

Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.

  • 01 One live database, no version conflicts
  • 02 Per-project pricing, not per-seat
Get Early Access

Free during beta · No credit card

Related programs

Summaries of public disclosures by RPX Gold Inc. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.

Report a correction →