- Best intercept
- 4.26 m @ 25.50 g/t Au (incl. 0.71 m @ 135.00 g/t Au) ↗ Released Oct 7, 2026
- Last update
Program timeline
- 02 Assay results
Assays from 12 holes totalling 2,051 m included SD-26-701 at 25.50 g/t Au over 4.26 m core length, including 135.00 g/t Au over 0.71 m, in the South Pit. Intervals use a 0.40 g/t Au cut-off and up to 6.0 m of internal dilution, with no capping, and are core lengths; true width in the Jubilee Shear is estimated at 50 to 95% of core length. The 20,000 m program was still underway and expected to finish by the end of October, with about two-thirds of the PFS-related meterage complete. No cumulative program metres were stated.
Source: Company IR ↗ - 01 Metre update
RPX reported a second diamond drill mobilized on the ongoing 20,000 m program, which had started in April. As of July 12, approximately 5,000 m had been completed.
Source: Company IR ↗
About the project
The Wawa Gold Project is in the Michipicoten greenstone belt of northwestern Ontario. The 2026 program is a planned 20,000 m of drilling to support a prefeasibility study, with completion expected by the end of October. Intervals in the October 7 release are core lengths. Collar coordinates in that release are UTM easting and northing without a stated zone or datum, so this profile is not plotted.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by RPX Gold Inc. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →