- Best intercept
- 43 m true width @ 10.53% ZnEq ↗ Released Sep 15, 2026
- Metres drilled
- 6,505 m of up to 7,500 m planned at Macpass
- Last update
Program timeline
- 02 Assay results
Step-out TS26-003 cut 43 m true width at 10.53% ZnEq (74.77 m core length at 6.63% Zn, 4.28% Pb and 22.39 g/t Ag), inside 64 m true width at 8.35% ZnEq (111.63 m from 982.34 m at 5.42% Zn, 3.21% Pb and 16.77 g/t Ag). The company flagged core recovery below 85% on that interval. Macpass drilling stood at 6,505 m (4,710 m Tom South, 1,795 m Tom East) with three rigs on site. Mactung drilling, reported separately, was complete at 2,099 m.
Source: Company IR ↗ - 01 Program start
Drilling was underway at Macpass. The plan was up to 7,500 m there (about 6,000 m at Tom South and about 1,500 m at Tom East), inside about 9,500 m combined with separate Mactung drilling.
Source: Company IR ↗
About the project
Macpass is Fireweed’s zinc-lead-silver project in eastern Yukon. The 2026 holes are step-outs at Tom South and Tom East. Metres drilled at the separate Mactung tungsten project are not included in this total.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by Fireweed Metals Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →