- Best intercept
- 7.81 m @ 41.34 g/t Au (incl. 2.25 m @ 130.77 g/t Au) ↗ Released Oct 6, 2026
- Metres drilled
- 20,980 m of up to 25,000 m planned
- Last update
Metres drilled to date
2 disclosures| Release date | Metres to date |
|---|---|
| Jun 25, 2026 | 3,203 m |
| Oct 6, 2026 | 20,980 m |
Program timeline
- 03 Assay results
The 2026 field season was complete at 100 holes and 20,980 m, with assays released for 16 holes and 84 holes still awaiting results. ML26-56 returned 41.34 g/t Au over 7.81 m from 100.62 m, including 130.77 g/t Au over 2.25 m from 105.54 m and 194.23 g/t Au over 1.03 m from 106.76 m; ML26-54 returned 6.10 g/t Au, 10.76 g/t Ag and 0.55% Cu over 5.79 m from 64.31 m, including 15.15 g/t Au, 24.89 g/t Ag and 1.22% Cu over 1.95 m. Intervals are drilled lengths, with estimated true thickness at 60-70% of the drilled interval; the release allocates 54 holes and 10,823 m to the TESS trend, 11 holes and 2,027 m to Phoenix, 11 holes and 2,273 m to Pebble, 12 holes and 3,008 m to NIT, and 12 holes and 2,849 m to isolated targets.
Source: Company IR ↗ - 02 Metre update
Fifteen holes totaling 3,203 m had been completed. Twelve holes and 2,591 m were at TESS-NV, and three holes and 612 m were on a fence about 200 m west of TESS-NV. Two rigs were on site, a third was expected on June 27, and samples were at the laboratory.
Source: Company IR ↗ - 01 Program start
Drilling had started at ML, with the first core extracted on May 24. The fully funded program was up to 25,000 m with three rigs, planned through the end of September. Initial holes were step-outs on the TESS zone.
Source: Company IR ↗
About the project
The ML Project is Prospector Metals’ gold-copper-silver project in Yukon. The 2026 program drilled nine target areas, with the assays released through October 6 coming from the TESS zone and adjacent holes. Drilling for the season is finished. Assays were still pending for 84 of the 100 holes.
The October 6 release lists collars for the holes in that batch, including ML26-056 at 361226E, 7131574N. It does not state a UTM zone or datum, so the profile is not plotted.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by Prospector Metals Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →