- Best intercept
- 38.08 m @ 1.47 g/t Au (incl. 7.88 m @ 5.13 g/t Au and 2.88 m @ 10.48 g/t Au) ↗ Released Oct 20, 2026
- Last update
Program timeline
- 04 Assay results
First 2026 diamond-drill assays. WHTGS26D0219 at Golden Saddle intersected 1.47 g/t Au over 38.08 m from 397.12 m, including 5.13 g/t Au over 7.88 m and 10.48 g/t Au over 2.88 m. QV26-026 intersected 2.53 g/t Au over 18.90 m from 172.10 m, and QV26-024 intersected 0.71 g/t Au over 38.45 m from 244.55 m. Intervals are core lengths; true widths are estimated at 80–95% of core length at Golden Saddle and 90–95% at VG. The company stated 2026 metres completed by area — Golden Saddle 6,451 m (12 holes), VG 2,909.3 m (9 holes), Ryan's Surprise 4,823.4 m (15 holes), Arc 1,029 m (4 holes), Golden Saddle 2.0 2,643.95 m (9 holes) and VG East 953 m (4 holes) — and did not state a program total. Assays were pending for 49 additional holes.
Source: Company IR ↗ - 03 Metre update
The company reported 11,500 m of diamond drilling completed to date, focused on Golden Saddle, VG and Ryan's Surprise. Drilling had started at VG East, Golden Saddle 2.0 was planned to begin in the coming weeks, and an additional 5,000 m was planned on White Gold and QV targets.
Source: Company IR ↗ - 02 Metre update
The diamond program started May 28 with one rig and reached three rigs within two weeks, targeting 15,000 to 20,000 m. Approximately 7,000 m in 18 holes had been completed, and three rigs were operating.
Source: Company IR ↗ - 01 Program start
White Gold announced the start of its 2026 exploration program, including diamond drilling aimed at Golden Saddle, Arc, Ryan's Surprise and VG. This release did not state metres completed or a program metre target.
Source: Company IR ↗
About the project
The White Gold Project is White Gold Corp.’s gold property in the Dawson Mining District, Yukon, described by the company as 95 km south of Dawson City. The 2026 diamond program is testing Golden Saddle, Arc, Ryan’s Surprise and VG, plus nearby targets including Golden Saddle 2.0 and VG East.
Reported intervals are core lengths. The October 20 collar table lists easting and northing and does not state a datum or zone, so the profile is not plotted. The company has not stated a single completed total for 2026 drilling. W2 Critical Minerals Corp. is a 2026 spin-out of White Gold’s critical-mineral properties and is a different project from this one.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by White Gold Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →