Gold

RC Gold

Sitka Gold Corp. TSXV: SIG

Actively Drilling Yukon, Canada
Metres drilled
58,000 m approximately, in 143 holes; of 60,000 m planned for 2026
Last update

Metres drilled to date

2 disclosures
Metres drilled to date by release
Release dateMetres to date
Apr 29, 20265,500 m
Oct 14, 202658,000 m
Cumulative metres as stated in each release. Points link to the source event below. Report a correction

Program timeline

  1. 03
    Assay results

    The release reports assays for four holes at Saddle and Eiger. DDRCCC-26-156 at Saddle returned 236.0 m of 1.15 g/t Au, including 71.0 m of 2.79 g/t Au (including 36.3 m of 3.31 g/t Au and 21.9 m of 3.25 g/t Au). At Eiger, DDRCCC-26-150 returned 45.5 m of 1.16 g/t Au from 182.5 m, including 4.5 m of 9.26 g/t Au and 1.5 m of 24.80 g/t Au, and 16.4 m of 1.95 g/t Au from 303.6 m, including 1.5 m of 13.45 g/t Au. DDRCCC-26-155 returned 18.1 m of 2.36 g/t Au from 287.0 m. Intervals are drilled core lengths; true widths were not determined. About 58,000 m in 143 holes had been completed toward 60,000 m planned, with six rigs turning. Results had been released for 59 holes, and 84 holes were pending.

    Source: Company IR ↗
  2. 02
    Metre update

    Six holes were complete and four more were in progress, for 5,500 m drilled in 2026. Four rigs were active, with two more expected. Visible gold had been observed in the completed 2026 holes at Blackjack and Rhosgobel, and assays were pending. The release states that visible gold observations do not imply grade.

    Source: Company IR ↗
  3. 01
    Program start

    Sitka commenced a diamond drill program of up to 60,000 m at RC Gold. Planned allocation was 30,000 m at Rhosgobel, up to 15,000 m on the Blackjack-Saddle-Eiger corridor, up to 10,000 m at Pukelman-Contact, and up to 5,000 m on other targets including Bear Paw. No 2026 metres completed were stated.

    Source: Company IR ↗

About the project

RC Gold is Sitka Gold’s road-accessible project in Yukon’s Tombstone Gold Belt, about 100 km east of Dawson City. The 2026 diamond drill program is planned at 60,000 m, with work at the Blackjack, Eiger and Rhosgobel deposits and at the Saddle, Pukelman-Contact and Bear Paw zones. Assay intervals reported on October 14 are drilled lengths; true widths were not determined.

Running your own program?

Log the next program in one database.

Blue Butterfly is core logging software built by geologists — validation at entry and assay imports that line up with your intervals.

  • 01 One live database, no version conflicts
  • 02 Per-project pricing, not per-seat
Get Early Access

Free during beta · No credit card

Related programs

Summaries of public disclosures by Sitka Gold Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.

Report a correction →